About
Located adjacent to the M1 Pacific Motorway, less than 1 hour to Newcastle and 30 minutes to the NorthConnex tunnel at Wahroonga is the head office and one of several industrial manufacturing sites belong to the Borg Group of Companies.
This existing facility includes offices and a manufacturing workshop and factory.
The site is very large and includes an adjoining vacant industrial parcel of land ideal for the future growth of the various Borg businesses and companies, including Crossmuller Pty Ltd.
Key Details
- Only 30 minutes drive to the NorthConnex tunnel at Wahroonga and less than 1 hour from Newcastle.
- Fully serviced and connections available to utility services off Kangoo Road and Wella Way at Somersby, it is proposed to expand the Wella Way site onto the adjoining industrial zoned parcel to enable the growth of the Crossmuller business that currently occupies the factory and workshop building.
- Crossmuller is a subsidiary of the Borg Group which specialises in end-to-end manufacturing and automation systems. The proposed Wella Way expansion project will be a State Significant Development to be lodged to the NSW Department of Planning, Housing & Infrastructure in early 2025.
- The expansion project will be predominantly used by Crossmuller to grow its manufacturing capabilities including sheetmetal cutting, pressing, rolling and welding, structural steel processing and fabricating.
Site Features
- B-double access
- Parking
- Convenient access to the M1 Pacific Motorway
- Secure site access